Case Study — PRJ-003
Allada hospital construction and equipment project, Benin
A hospital facilities and medical-equipment project intended to improve access to healthcare in the region.
Participation overview
- Period: June 2014 to May 2016
- Role: Medical-equipment planning
- Participating organization: EARL Consultants
The work was divided into several short phases, including basic design, detailed design, and on-site confirmation, rather than one continuous overseas assignment.
Scope
- Basic design
- Detailed design
- Medical-equipment planning
- French-language specifications
- Tender documents
- Tender supervision
- On-site confirmation
Distinguishing responsibilities from the overall project
The hospital’s clinical functions and regional healthcare purpose describe the broader project context. My responsibilities were limited to the medical-equipment planning scope listed above.